Aerial video 138797
Video der Baustelle des Neubaus des Schiffshebewerkes Niederfinow Nord durch die DSD Brückenbau GmbH, die Johann Bunte Bauunternehmung GmbH & Co. KG , Bilfinger Berger Ingenieurbau GmbH und die Siemag GmbH. Look at the new building of the boat lift Niederfinow North Bridge. The new building needed because the old boat lift of 1934 has now reached the end of its life. To maintain the function of the Havel-Oder waterway, it must therefore be replaced by a new building on schedule.
NIEDERFINOW 11.06.2011
Aerial image ID: 138797
Video resolution: 1920 x 1080 pixels (Full-HD. oder 3K, 90fps)
Compressed video file size: 413,87 MB
Duration: 01:48
Sources and credit: © euroluftbild.de/Robert Grahn
TV press and media area licensing according to MFM table!