Aerial photograph 170471
View at the construction site of the storm surge barrier in the Ryck at the Bodden in the district Wieck in Greifswald in the federal state Mecklenburg-Vorpommern. The surge barrier Greifswald-Wieck forms an integral part of the flood protection system for Greifswald. Responsible for the planning is the Hydro Project Engineer GmbH operating construction company is the Ed. Züblin AG
GREIFSWALD 18.10.2012
View at the construction site of the storm surge barrier in the Ryck at the Bodden in the district Wieck in Greifswald in the federal state Mecklenburg-Vorpommern. The surge barrier Greifswald-Wieck forms an integral part of the flood protection system for Greifswald. Responsible for the planning is the Hydro Project Engineer GmbH operating construction company is the Ed. Züblin AG. www.sperrwerk-greifswald.de / www.hydroprojekt.de / www.zueblin.de / www.greifswald.de
Aerial image ID: 170471
Image resolution: 7360 x 4912 pixels x 24 bit
compressed image file size: 11,1 MB
Image file size: 103,43 MB
Sources and credit: © euroluftbild.de/Robert Grahn
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal
Position: 54° 5' 31.44'' N / 13° 27' 46.7'' E