Aerial Photo Database
Fulltext
  • Fulltext
  • Place

Search for place, image id, term(s)

Only search for place

Aerial photograph 169517
View at the construction site for gap closure of the subway line U5 in the Rathausstraße in the district Mitte in Berlin. The extension of the subway line U5 and therefore connecting the eastern city area across the Alexanderplatz to the Central Station is the most important new construction measure in the metro network of Berlin. The "new U5" becomes the second longest subway line in Berlin with a range from Hoenow to Central Station. Operating construction company is Bilfinger & Berger

BERLIN 18.09.2012

Aerial photograph Berlin - View at the construction site for gap closure of the subway line U5 in the Rathausstraße in the district Mitte in Berlin. The extension of the subway line U5 and therefore connecting the eastern city area across the Alexanderplatz to the Central Station is the most important new construction measure in the metro network of Berlin. The new U5 becomes the second longest subway line in Berlin with a range from Hoenow to Central Station. Operating construction company is Bilfinger & Berger
https://www.aerialphotosearch.com/info/aerial-photos/view-construction-site-for-gap-closure-subway-line-rathausstrasse-district-mitte-berlin-extension-subway-line-therefore-connecting-eastern-city-area-across-alexanderplatz-central-station-most-important-new-construction-measure-metro-network-berlin-new-becomes-second-longest-subway-line-berlin-with-range-from-hoenow-central-station-operating-construction-company-bilfinger-berger-169517.html https://www.aerialphotosearch.com/info/aerial-photos/view-construction-site-for-gap-closure-subway-line-rathausstrasse-district-mitte-berlin-extension-subway-line-therefore-connecting-eastern-city-area-across-alexanderplatz-central-station-most-important-new-construction-measure-metro-network-berlin-new-becomes-second-longest-subway-line-berlin-with-range-from-hoenow-central-station-operating-construction-company-bilfinger-berger-169517.html

View at the construction site for gap closure of the subway line U5 in the Rathausstraße in the district Mitte in Berlin. The extension of the subway line U5 and therefore connecting the eastern city area across the Alexanderplatz to the Central Station is the most important new construction measure in the metro network of Berlin. The "new U5" becomes the second longest subway line in Berlin with a range from Hoenow to Central Station. Operating construction company is Bilfinger & Berger. www.bilfinger.com / www.bvg.de

Aerial image ID: 169517
Image resolution: 7312 x 4768 pixels x 24 bit
compressed image file size: 10,07 MB
Image file size: 99,75 MB
Sources and credit: © euroluftbild.de/Robert Grahn

The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal