Aerial image 157060
View of the almost fully assembled solar fields of the new solar power plant Finow Tower. The hybrid solar AG is currently building on the former military airport, a solar power plant
FINOW / FINOWFURT 05.04.2012
View of the almost fully assembled solar fields of the new solar power plant Finow Tower. The hybrid solar AG is currently building on the former military airport, a solar power plant. www.solarhybrid.ag Photo: Bernd Clemens
Aerial image ID: 157060
Image resolution: 4116 x 2744 pixels x 24 bit
compressed image file size: 3,56 MB
Image file size: 32,31 MB
Sources and credit: © euroluftbild.de/Bernd Clemens
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal