Aerial image 637698
New construction of the waste incineration plant for waste treatment of ZAK in Ringsheim in the state Baden-Wuerttemberg, Germany
RINGSHEIM 27.04.2024
New construction of the waste incineration plant for waste treatment of ZAK in Ringsheim in the state Baden-Wuerttemberg, Germany. Further information at: Ritter-Bau GmbH, ZAK Zweckverband Abfallbehandlung Kahlenberg Koerperschaft des oeffentlichen Rechts. www.zak-ringsheim.de / www.ritter-bau.de Photo: Martin Bildstein
Aerial image ID: 637698
Image resolution: 8502 x 5668 pixels x 24 bit
compressed image file size: 60,05 MB
Image file size: 137,87 MB
Sources and credit: © euroluftbild.de/Martin Bildstein
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal
Position: 48° 14' 19.45'' N / 7° 47' 3.58'' E