Aerial Photo Database
Fulltext
  • Fulltext
  • Place

Search for place, image id, term(s)

Only search for place

Aerial photograph 448517
New construction site and extension of the sewage treatment basins and purification stages of the plant of ProRheno in the district Kleinhueningen in Basel, Switzerland

BASEL 15.02.2020

Aerial photograph Basel - New construction site and extension of the sewage treatment basins and purification stages of the plant of ProRheno in the district Kleinhueningen in Basel, Switzerland
Thematically related aerial photos
https://www.aerialphotosearch.com/info/aerial-photos/new-construction-site-extension-sewage-treatment-basins-purification-stages-plant-prorheno-district-kleinhueningen-basel-switzerland-448517.html https://www.aerialphotosearch.com/info/aerial-photos/new-construction-site-extension-sewage-treatment-basins-purification-stages-plant-prorheno-district-kleinhueningen-basel-switzerland-448517.html

New construction site and extension of the sewage treatment basins and purification stages of the plant of ProRheno in the district Kleinhueningen in Basel, Switzerland. Further information at: ERNE AG Bauunternehmung, ProRheno AG. www.prorheno.ch / www.erne.ch Photo: Erich Meyer

Aerial image ID: 448517
Image resolution: 8256 x 5504 pixels x 24 bit
compressed image file size: 15,21 MB
Image file size: 130,01 MB
Sources and credit: © euroluftbild.de/Erich Meyer

The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal