Aerial image 208408
In the Harjesstrasse of Gotha in Thuringia regions of utilities Eon Thueringer Energie AG operates a substation. The new 110-kV high-voltage system and the 20 kV switchgear ensures the safeguarding of the electricity demand in Gotha
GOTHA 23.06.2013
In the Harjesstrasse of Gotha in Thuringia regions of utilities Eon Thueringer Energie AG operates a substation. The new 110-kV high-voltage system and the 20 kV switchgear ensures the safeguarding of the electricity demand in Gotha. www.thueringerenergie.de Photo: Karina Hessland
Aerial image ID: 208408
Image resolution: 4380 x 2838 pixels x 24 bit
compressed image file size: 8 MB
Image file size: 35,56 MB
Sources and credit: © euroluftbild.de/Karina Hessland
All information gathered here in picture and word represent a non-binding information offer to you, which was compiled from trustworthy media. Objections or correction notes please to info@euroluftbild.de - Media licenses according to MfM table!
Position: 51° 28' 23.27'' N / 11° 55' 46.2'' E