Aerial image 155410
Construction of the Unstruttalbrücke bei Karsdorf. The concrete viaduct is an integral prestressed concrete box girder bridge with 6 continuous beams with 4 arcs and will reach 2.7 km in length. The new ICE - line of the project VDE 8 should go into operation in 2015. The building companies are Alpine Bau AG and Berger Bau GmbH. The designs come from DB ProjektBau GmbH, Structural Engineering, and Schlaich, Berger & Partner. In 2013, the work to be completed

KARSDORF 09.03.2012

Karsdorf from above - Construction of the Unstruttalbrücke bei Karsdorf. The concrete viaduct is an integral prestressed concrete box girder bridge with 6 continuous beams with 4 arcs and will reach 2.7 km in length. The new ICE - line of the project VDE 8 should go into operation in 2015. The building companies are Alpine Bau AG and Berger Bau GmbH. The designs come from DB ProjektBau GmbH, Structural Engineering, and Schlaich, Berger & Partner. In 2013, the work to be completed
Thematically related aerial photos
https://www.aerialphotosearch.com/info/aerial-photos/construction-unstruttalbrcke-bei-karsdorf-concrete-viaduct-integral-prestressed-concrete-box-girder-bridge-with-continuous-beams-with-arcs-will-reach-length-new-ice-line-project-vde-should-into-operation-building-companies-are-alpine-bau-berger-bau-gmbh-designs-come-from-projektbau-gmbh-structural-engineering-schlaich-berger-partner-work-completed-155410.html https://www.aerialphotosearch.com/info/aerial-photos/construction-unstruttalbrcke-bei-karsdorf-concrete-viaduct-integral-prestressed-concrete-box-girder-bridge-with-continuous-beams-with-arcs-will-reach-length-new-ice-line-project-vde-should-into-operation-building-companies-are-alpine-bau-berger-bau-gmbh-designs-come-from-projektbau-gmbh-structural-engineering-schlaich-berger-partner-work-completed-155410.html

Construction of the Unstruttalbrücke bei Karsdorf. The concrete viaduct is an integral prestressed concrete box girder bridge with 6 continuous beams with 4 arcs and will reach 2.7 km in length. The new ICE - line of the project VDE 8 should go into operation in 2015. The building companies are Alpine Bau AG and Berger Bau GmbH. The designs come from DB ProjektBau GmbH, Structural Engineering, and Schlaich, Berger & Partner. In 2013, the work to be completed. www.baustellen-doku.info / www.alpine-bau.de / www.bergerholding.eu / www.dbprojektbau.dbnetze.com / www.sbp.de

Aerial image ID: 155410
Image resolution: 4117 x 2613 pixels x 24 bit
compressed image file size: 2,86 MB
Image file size: 30,78 MB
Sources and credit: © euroluftbild.de/Robert Grahn

The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal