Aerial Photo Database
Fulltext
  • Fulltext
  • Place

Search for place, image id, term(s)

Only search for place

Aerial photograph 155397
Construction of the Unstruttalbrücke bei Karsdorf. The concrete viaduct is an integral prestressed concrete box girder bridge with 6 continuous beams with 4 arcs and will reach 2.7 km in length. The new ICE - line of the project VDE 8 should go into operation in 2015. The building companies are Alpine Bau AG and Berger Bau GmbH. The designs come from DB ProjektBau GmbH, Structural Engineering, and Schlaich, Berger & Partner. In 2013, the work to be completed

KARSDORF 09.03.2012

Aerial photograph Karsdorf - Construction of the Unstruttalbrücke bei Karsdorf. The concrete viaduct is an integral prestressed concrete box girder bridge with 6 continuous beams with 4 arcs and will reach 2.7 km in length. The new ICE - line of the project VDE 8 should go into operation in 2015. The building companies are Alpine Bau AG and Berger Bau GmbH. The designs come from DB ProjektBau GmbH, Structural Engineering, and Schlaich, Berger & Partner. In 2013, the work to be completed
Thematically related aerial photos
https://www.aerialphotosearch.com/info/aerial-photos/construction-unstruttalbrcke-bei-karsdorf-concrete-viaduct-integral-prestressed-concrete-box-girder-bridge-with-continuous-beams-with-arcs-will-reach-length-new-ice-line-project-vde-should-into-operation-building-companies-are-alpine-bau-berger-bau-gmbh-designs-come-from-projektbau-gmbh-structural-engineering-schlaich-berger-partner-work-completed-155397.html https://www.aerialphotosearch.com/info/aerial-photos/construction-unstruttalbrcke-bei-karsdorf-concrete-viaduct-integral-prestressed-concrete-box-girder-bridge-with-continuous-beams-with-arcs-will-reach-length-new-ice-line-project-vde-should-into-operation-building-companies-are-alpine-bau-berger-bau-gmbh-designs-come-from-projektbau-gmbh-structural-engineering-schlaich-berger-partner-work-completed-155397.html

Construction of the Unstruttalbrücke bei Karsdorf. The concrete viaduct is an integral prestressed concrete box girder bridge with 6 continuous beams with 4 arcs and will reach 2.7 km in length. The new ICE - line of the project VDE 8 should go into operation in 2015. The building companies are Alpine Bau AG and Berger Bau GmbH. The designs come from DB ProjektBau GmbH, Structural Engineering, and Schlaich, Berger & Partner. In 2013, the work to be completed. www.baustellen-doku.info / www.alpine-bau.de / www.bergerholding.eu / www.dbprojektbau.dbnetze.com / www.sbp.de

Aerial image ID: 155397
Image resolution: 2832 x 4256 pixels x 24 bit
compressed image file size: 3,23 MB
Image file size: 34,48 MB
Sources and credit: © euroluftbild.de/Robert Grahn

The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal

Keywords