Aerial image 519890
Construction site for the new construction of the waste incineration plant for waste treatment MVA residual waste combined heat and power plant and a mono sewage sludge incineration on the street Ahrensburger Weg in Stapelfeld in the state Schleswig-Holstein, Germany
STAPELFELD 07.10.2021
Construction site for the new construction of the waste incineration plant for waste treatment MVA residual waste combined heat and power plant and a mono sewage sludge incineration on the street Ahrensburger Weg in Stapelfeld in the state Schleswig-Holstein, Germany. Further information at: EEW Energy from Waste GmbH, Heitkamp Construction GmbH, Ingenieur- und Sachverstaendigenbuero Roland Braun, WOLFFKRAN International AG, u&i - umwelttechnik und ingenieure GmbH. www.eew-energyfromwaste.com / www.heitkamp-ikb.com / www.uigmbh.de / www.energie-zukunft-stapelfeld.de / www.rolandbraun.de / www.wolffkran.com Photo: Robert Grahn
Aerial image ID: 519890
Image resolution: 8256 x 5504 pixels x 24 bit
compressed image file size: 13,31 MB
Image file size: 130,01 MB
Sources and credit: © euroluftbild.de/Robert Grahn
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal
Position: 53° 36' 58.49'' N / 10° 13' 27.17'' E