Aerial photograph 607727
Construction site for the new construction of the road bridges - route and routing of the replacement power bridge train as a pylon bridge named "Kaiser-Otto-Bridge and Queen-Editha-Bridge" over the Zollelbe and the Alte Elbe on the Mittelstrasse in the district Werder in Magdeburg in the state Saxony- Anhalt, Germany
MAGDEBURG 06.04.2023
Construction site for the new construction of the road bridges - route and routing of the replacement power bridge train as a pylon bridge named "Kaiser-Otto-Bridge and Queen-Editha-Bridge" over the Zollelbe and the Alte Elbe on the Mittelstrasse in the district Werder in Magdeburg in the state Saxony- Anhalt, Germany. Further information at: GVP infraconsult GmbH, HOCHTIEF Aktiengesellschaft AG, Ingenieurgemeinschaft Gnade GmbH, LAP Leonhardt, Andrae und Partner Beratende Ingenieure VBI AG, SCHWENK Zement GmbH & Co. KG, SEH Engineering GmbH, Staedtische Werke Magdeburg GmbH & Co. KG. www.lap-consult.com / www.sw-magdeburg.de / www.gvp-infraconsult.de / www.hochtief.de / www.hochtief-solutions.de / www.hochtief-projektentwicklung.de / www.IG-Gnade.de / www.seh-engineering.de / www.schwenk-zement.de Photo: Robert Grahn
Aerial image ID: 607727
Image resolution: 5504 x 8256 pixels x 24 bit
compressed image file size: 14,43 MB
Image file size: 130,01 MB
Sources and credit: © euroluftbild.de/Robert Grahn
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal
Position: 52° 7' 36.95'' N / 11° 38' 56.18'' E