Aerial image 556684
Construction site to build a new combined cycle power plant with gas and steam turbine systems on factory premises of VW Volkswagen AG in Wolfsburg in the state Lower Saxony, Germany
WOLFSBURG 05.05.2022
Construction site to build a new combined cycle power plant with gas and steam turbine systems on factory premises of VW Volkswagen AG in Wolfsburg in the state Lower Saxony, Germany. Further information at: MHPS Mitsubishi Hitachi Power Systems Europe GmbH, VOLKSWAGEN AG, VW Kraftwerk GmbH, convex ZT GmbH, Envi Con Engineering GmbH. www.envi-con.de / www.volkswagen.de / www.volkswagenag.com / www.convex.at / www.vw-kraftwerk.de / www.eu.mhps.com Photo: Robert Grahn
Aerial image ID: 556684
Image resolution: 8256 x 5504 pixels x 24 bit
compressed image file size: 9,58 MB
Image file size: 130,01 MB
Sources and credit: © euroluftbild.de/Robert Grahn
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal
Position: 52° 26' 36.3'' N / 10° 45' 37.07'' E