Aerial Photo Database
Fulltext
  • Fulltext
  • Place

Search for place, image id, term(s)

Only search for place

Aerial photograph 129987
Blick auf die winterlich verschneite Baustelle des Neubaus des Schiffshebewerkes Niederfinow Nord durch die DSD Brückenbau GmbH, die Johann Bunte Bauunternehmung GmbH & Co. KG , Bilfinger Berger Ingenieurbau GmbH und die Siemag GmbH. Look at the new building of the boat lift Niederfinow North Bridge. The new building needed because the old boat lift of 1934 has now reached the end of its life. To maintain the function of the Havel-Oder waterway, it must therefore be replaced by a new building on schedule.

NIEDERFINOW 04.12.2010

Niederfinow from the bird's eye view: Blick auf die winterlich verschneite Baustelle des Neubaus des Schiffshebewerkes Niederfinow Nord durch die DSD Brückenbau GmbH, die Johann Bunte Bauunternehmung GmbH & Co. KG , Bilfinger Berger Ingenieurbau GmbH und die Siemag GmbH. Look at the new building of the boat lift Niederfinow North Bridge. The new building needed because the old boat lift of 1934 has now reached the end of its life. To maintain the function of the Havel-Oder waterway, it must therefore be replaced by a new building on schedule.
Thematically related aerial photos
https://www.aerialphotosearch.com/info/aerial-photos/blick-winterlich-verschneite-baustelle-neubaus-schiffshebewerkes-niederfinow-nord-durch-dsd-brckenbau-gmbh-johann-bunte-bauunternehmung-gmbh-bilfinger-berger-ingenieurbau-gmbh-siemag-gmbh-look-new-building-boat-lift-niederfinow-north-bridge-new-building-needed-because-old-boat-lift-has-now-reached-end-life-maintain-function-havel-oder-waterway-must-therefore-replaced-new-building-schedule-129987.html https://www.aerialphotosearch.com/info/aerial-photos/blick-winterlich-verschneite-baustelle-neubaus-schiffshebewerkes-niederfinow-nord-durch-dsd-brckenbau-gmbh-johann-bunte-bauunternehmung-gmbh-bilfinger-berger-ingenieurbau-gmbh-siemag-gmbh-look-new-building-boat-lift-niederfinow-north-bridge-new-building-needed-because-old-boat-lift-has-now-reached-end-life-maintain-function-havel-oder-waterway-must-therefore-replaced-new-building-schedule-129987.html

www.schiffshebewerkndf.de / www.wsv.de / www.ingenieurbau.bilfinger.de / www.bilfinger.de

Aerial image ID: 129987
Image resolution: 4256 x 2832 pixels x 24 bit
compressed image file size: 4,57 MB
Image file size: 34,48 MB
Sources and credit: © euroluftbild.de/Robert Grahn

The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal

Keywords