Aerial image 119070
Blick auf das Klärwerk Ruhleben der Berliner Wasserbetriebe. Die Anlage wurde 1963 erbaut und seitdem erheblich erweitert. Die Kapazität des Klärwerks beträgt bei Trockenwetter 247.500 Kubikmeter am Tag, bei Regen bis zu 600.000 Kubikmeter. View of the sewage treatment plant in Ruhleben. The plant was built in 1963 and were expanded considerably since then. The capacity of the sewage treatment plant is 247 500 cubic meters per day during dry weather, with rain up to 600,000 cubic meters.
BERLIN 27.07.2010
Aerial image ID: 119070
Image resolution: 4256 x 2832 pixels x 24 bit
compressed image file size: 4,95 MB
Image file size: 34,48 MB
Sources and credit: © euroluftbild.de/Robert Grahn
The recording is permitted due to the so-called freedom of panorama according to § 59 UrhG. The provision of Section 59 UrhG conforms to the directive based on Art. 5 Para. 3 Letter c of Directive 2001/29/EC of the European Parliament and of the Council of May 22, 2001 on the harmonization of certain aspects of copyright and related property rights in the information society ("InfoSoc-RL") to be interpreted. The directive-compliant interpretation shows that aerial photographs are also covered by § 59 Para. 1 UrhG and the use of tools does not lead out of the protective barrier. www.klebba.legal